Skip to content
structIQe

Find your Estimate

Back to pricing
Prices in

Estimated cost INR0 a month: plan INR0, credits INR0, storage INR0.

Number of users

Work your firm runs each month

Your estimate

Plans
Billing period

Includes 1 GB storage

PROJECT Assist

1 user

INR0

Storage

Add storage to see its cost

INR0

Credits

Add your work to see credits

INR0

Your estimated cost per month

INR0

Prices exclude applicable taxes, added at checkout.

Get started

Note: These estimates use typical job sizes. Actual use depends on the size of each job. See detailed credit rates below

INR0a month

Credit rates.

What each job uses in credits.

JobCredits per runCredits
Fill in Title BlockNot set yet2 per drawing
Update LayoutNot set yet5 per drawing
Rename/Replace XrefNot set yet5 per dependent drawing
Plot PDFNot set yet10 per drawing
Submit InternallyNot set yet10 per drawing
Submit Externally (Record)Not set yet25 per drawing
Cross-sections with Coordinate tableNot set yet2 per tendon, per section
Tendons on curved plansNot set yet20 per tendon, per plan
Tendons along picked alignmentsNot set yet30 per tendon, per plan
Elongation detailsNot set yet5 per tendon
Profile levelsNot set yet10 per chainage
Pile coordinatesNot set yet5 per pile
Biaxial Analysis20010 per 0.1 s of compute
Uniaxial Analysis40020 per 0.1 s of compute
Structural Analysis30020 per 0.1 s of compute
Base Pressure Check10020 per 0.1 s of compute
Script generationNot set yet2 per command/row
Integrated AI AgentNot set yet1.5x (API rates)
MCP ConnectorNot set yet2 per KB downloaded